Project dossier113 / 140

majiks-brand-kit

Every field note and chapter that passed through this repository.

Commits
5
Active days
3
Stories
5
Project chronology

The paper trail.

March 29, 2026 to April 3, 2026

Chapter · 2026-W14 · 5 min read

Stabilizing the Mesh: The Week in Code

Monday started with the kind of momentum that makes you think you can tackle everything in one go. Instead, it was a day of triage. The headline wasn't a shiny new feature but rather tightening the loose end…

104week total
Daily dispatch · 3 min read

Friday Fix: The GPU Key and the Mobile Launch

Thirty-four commits across ten repos. It was one of those days where the infrastructure finally clicked and the mobile apps finally breathed. The headline isn't the art studio polish. It is the GPU agent aut…

1repo commits
Daily dispatch · 2 min read

Keycloak, GPUs, and the Brand Kit

Today was about tightening the bolts and building out the engine room. Three things defined the arc: fixing the authentication bridge so it actually works, provisioning the heavy lifting for our inference ne…

1repo commits
Daily dispatch · 2 min read

Monday cleanup: Brand kit, broadcaster audit, and mobile polish

Sunday is usually for sleeping in, but the git log says I spent 32 commits across five repos. That is not a rest day. That is a day where I chased down loose ends in the broadcaster, cleaned up the mobile re…

3repo commits
Chapter · 2026-W13 · 6 min read

The Week We Stopped Building Toys

The week started with a release, but it ended with a cleanup. That is the arc of a mature engineering cycle. You spend the first half of the week pushing features out the door, and the second half sweeping u…

111week total